• High Pressure GT A380 Metal Stamping Mold
  • High Pressure GT A380 Metal Stamping Mold

    High Pressure GT A380 Metal Stamping Mold

    Product Details:

    Place of Origin: Dongguan China
    Brand Name: GT
    Certification: CE / ISO9001
    Model Number: Metal Stamping Mold

    Payment & Shipping Terms:

    Minimum Order Quantity: 1 mold
    Price: Negotiate
    Packaging Details: Woodencase for packaging mold & Carton Box for packaging products
    Delivery Time: 20 days after 2D 3D confirmed
    Payment Terms: T/T, L/C, Western Union
    Supply Ability: 65 molds / month
    Get Best Price Contact Now

    Detail Information

    Mold Base: LKM C50 + P20 For AB , Cast Iron Etc Product Material: Aluminium , ADC12 , ADC14 , A360 , A380 , AlSi9Cu3 And So On
    Shape & Color: Can Be Design According To Your Needs Model: Sheet Metal Stamping Molds Tool And Die Makers
    Item Name: Metal Stamping Mold Certificated: ISO 9001:2015 Certificated
    Shaping Mode: Die Casting Mold Treatment: Heat Treatment >HRC45
    High Light:

    GT Metal Stamping Mold

    ,

    A380 Metal Stamping Mold

    ,

    A380 steel casting molds

    Product Description

    High Pressure GT A380 Metal Stamping Mold



     

    Basic information:

     

    Brand Moldie
    Mold Base LKM C50 + P20 for AB, Cast iron etc.
    Inserts(cavity and core) Dievar, H13, 8407, 1.2344 or the material you required
    Standard HASCO, DME, MISUMI, PUNCH and so on
    Product Material ADC12, ADC14, A360, A380, AlSi9Cu3 and so on
    Mold Treatment Heat Treatment >HRC45
    Product Surface Sand blasting, Powder coated, Painting, Anodizing, etc
    Shape & Color Can be design according to your needs
    Process High Pressure Die Casting
    Certificated ISO 9001:2015 Certificated

     

    Trade information:

     

    MOQ 1 set
    Mold lead time T1 sample, about 3-10 weeks, according to the mold requirement
    Production lead time 2-5 weeks, according to the order Qty
    Mold payment term 50% T/T deposit with PO, balance 50% T/T after sample approved
    Products payment term 30% T/T deposit with PO, balance 70% T/T before shipment
    Port of loading Shenzhen


     

    Specifications:

     

    1. Quote competitive price according customer detail requirement

    2. Sign agreement.

    3. Customer T/T deposit to us to design mould

    4. Send mould drawing to customer for confirmation

    5. Mould design confirmed and start to make mould.

    6. Make mould trial during tooling time(which we get agreement with customer).

    7. Seed mould trial sample to customer for inspection.Or customer come to our factory to inspect mould

    personally.

    8. Customer T/T balance to us after mould confirmed.

    9. Deliver mould after get balance.

     

     

    Competitive Advantage:

    1. We keep long term cooperation with some world Top Brand on electronic product area, such Epson,
    Canon and Sony.
    2. We have successfully gained the quality certificate of ISO 9001 and IGS.
    3. We can design and manufacture the mould in different specification and standard, such as DME,HASCO
    and DAIDO.
    4. The factory is well equiped with the most advanced testing instrument, it is effective to ensure the precision
    of the mould.
    5. Strict quality control;
    6. Good After-sale service;
    7. On time delivery

    High Pressure GT A380 Metal Stamping Mold 0

    Want to Know more details about this product
    I am interested in High Pressure GT A380 Metal Stamping Mold could you send me more details such as type, size, quantity, material, etc.
    Thanks!
    Waiting for your reply.